NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Lower Chairlift
Pico Mountain
Vermont
Status Removed  
Type Chairlift - Double - Fixed  
Brand Stadeli  
Install Season 1962-63  
New Install? New  
Ancestors
Cost   
Install Length 4,000 feet  
Install Vertical 1,300 feet 
Final Season Standing 1974-75  
Descendants
Notes Possibly replaced with a shorter Hall double in 1975-76  

The lift line circa the 1960s
The lift line circa the 1960s

The bottom terminal (1960s)
The bottom terminal (1960s)



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
A grand hotel in northern New Hampshire
A grand hotel in northern New Hampshire
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2017, All Rights Reserved.