NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
South Ridge Double
Okemo Mountain Resort
Vermont
Status Removed  
Type Chairlift - Double - Fixed  
Brand Heron-Poma  
Install Season 1971-72  
New Install? New  
Ancestors
Cost   
Install Length 2,748 feet  
Install Vertical 408 feet 
Final Season Standing 1989-90  
Descendants
Notes  

The bottom terminal circa the late 1970s
The bottom terminal circa the late 1970s



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
A lost ski area with a gondola!
A lost ski area with a gondola!
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.