NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Adventure Triple
Stowe Mountain Resort
Vermont
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Leitner-Poma  
Install Season 2004-05  
New Install? New  
Ancestors
Cost   
Install Length 980 feet  
Install Vertical 127 feet 
Final Season Standing  
Descendants
Notes  

The Adventure Triple in 2006
The Adventure Triple in 2006

The Adventure Triple in 2006
The Adventure Triple in 2006

The bottom terminal (2014)
The bottom terminal (2014)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
Regaining its Magic
Regaining its Magic
A lost ski area with a gondola!
A lost ski area with a gondola!
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.