NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Lower Chairlift
Pico Mountain
Vermont
Status Removed  
Type Chairlift - Double - Fixed  
Brand Hall  
Install Season 1975-76  
New Install?  
Ancestors
Cost   
Install Length 3,860 feet  
Install Vertical 658 feet 
Final Season Standing 1987-88  
Descendants
Notes Possibly installed in 1975-76 or 1976-77. Possibly a new install.  

The Lower Chairlift (foreground) circa the mid to late 1970s
The Lower Chairlift (foreground) circa the mid to late 1970s

The Lower Chairlift in the 1980s with General Manager Frank Heald in the foreground
The Lower Chairlift in the 1980s with General Manager Frank Heald in the foreground



Also on NewEnglandSkiHistory.com...
The largest ski resort in New England.  Almost.
The largest ski resort in New England. Almost.
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
The only Skimobile in New England history
The only Skimobile in New England history
From a small area to a mega resort
From a small area to a mega resort
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.