NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Lower Chairlift
Pico Mountain
Vermont
Status Removed  
Type Chairlift - Double - Fixed  
Brand Hall  
Install Season 1975-76  
New Install?  
Ancestors
Cost   
Install Length 3,860 feet  
Install Vertical 658 feet 
Final Season Standing 1987-88  
Descendants
Notes Possibly installed in 1975-76 or 1976-77. Possibly a new install.  

The Lower Chairlift (foreground) circa the mid to late 1970s
The Lower Chairlift (foreground) circa the mid to late 1970s

The Lower Chairlift in the 1980s with General Manager Frank Heald in the foreground
The Lower Chairlift in the 1980s with General Manager Frank Heald in the foreground



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
From a small area to a mega resort
From a small area to a mega resort
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.