T-Bar
Maple Valley Vermont
|
Status |
Standing |
Type |
T-Bar |
Brand |
Hall |
Install Season |
1963-64 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
775 feet |
Install Vertical |
148 feet |
Final Season Standing |
|
Descendants |
| Notes |
|
|
|
 The lift line (1960s)
 The lift line (1960s)
 Generators and T-Bar in 2002
 T-Bar in 2002
 T-Bar in 2013
 The bottom terminal (2015)
 The bottom terminal (2015)
 The bottom terminal (2015)
 The bottom terminal (2015)
 The lift line (2015)
 The top terminal (2015)
 The top terminal (2015)
 The base terminal (November 2019)
 The lift line (November 2019)
 The base terminal (March 2020)
 The base terminal (March 2020)
 The lift line (March 2020)
 The lift line (March 2020)
 The lift line (March 2020)
 The lift line (March 2020)
Load More Photos
|