Status |
Removed |
Type |
Chairlift - Double - Fixed |
Brand |
Doppelmayr |
Install Season |
1982-83 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
1,860 feet |
Install Vertical |
433 feet |
Final Season Standing |
2013-14 |
Descendants |
| Notes |
2014 notes: "1982 Doppelmayr fixed grip double chair. "ALPINE" 12' line guage. 430 vertical x 1800 long. 1000 pass/hr., 460F FPM, 70 horsepower variable DC drive with 80 horepower JD diesel APU. Bottom drive/tension terminal, upper return terminal. Updated to hydraulic tensioning approx 3 years ag |
|
|