Snowdance Triple
Ascutney Mountain Vermont
|
Status |
Removed |
Type |
Chairlift - Triple - Fixed |
Brand |
CTEC |
Install Season |
1986-87 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
4,650 feet |
Install Vertical |
1,438 feet |
Final Season Standing |
2013-14 |
Descendants |
Peak Triple, Pats Peak, NH
| Notes |
Possibly constructed with Hall parts. |
|
|
 Snowdance Triple in 2002
 Snowdance Triple in 2002
 Snowdance Triple in 2004
 Snowdance Triple in 2004
 Snowdance Triple midstation in 2004
 Snowdance Triple top terminal in 2004
 Snowdance Triple top terminal in 2004
 Snowdance Triple bottom terminal in 2013
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The lift line (2014)
 The lift line (2014)
 The lift line (2014)
 The top terminal (2014)
Load More Photos
|
|