NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Northbrook Quad
Killington
Vermont
Status Standing  
Type Chairlift - Quad - Fixed  
Brand Poma  
Install Season 1996-97  
New Install? New  
Ancestors
Cost   
Install Length 2,279 feet  
Install Vertical 401 feet 
Final Season Standing  
Descendants
Notes  

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

Chairs (2015)
Chairs (2015)

The lift line (2015)
The lift line (2015)

The top terminal (2015)
The top terminal (2015)

The top terminal (2015)
The top terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2016)
The bottom terminal (2016)

A grip (2016)
A grip (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)



Also on NewEnglandSkiHistory.com...
The largest ski resort in New England.  Almost.
The largest ski resort in New England. Almost.
Killington and Pico almost connected
Killington and Pico almost connected
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
A lost ski area with a gondola!
A lost ski area with a gondola!
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.