NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Summit Triple
Camden Snow Bowl
Maine
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Riblet  
Install Season 2014-15  
New Install?  
Ancestors Summit Triple, Pleasant Mountain, ME
Cost   
Install Length 3,877 feet  
Install Vertical 826 feet 
Final Season Standing  
Descendants
Notes 160 chairs, 450 feet per minute, uphill capacity 1,600, 300 hp drive.  
Load Previous 20 Photos

A low closing bar (2015)
A low closing bar (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

Tower 5 (2015)
Tower 5 (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The top terminal (2015)
The top terminal (2015)

The top terminal (2015)
The top terminal (2015)

The top terminal (2015)
The top terminal (2015)

The top terminal (2015)
The top terminal (2015)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
The only Skimobile in New England history
The only Skimobile in New England history
Once one of the busiest areas in New England...now idle
Once one of the busiest areas in New England...now idle
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.