NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
T-Bar
High Pond Ski Area
Vermont
Status Standing  
Type T-Bar  
Brand Leitner-Poma  
Install Season 2017-18  
New Install? New  
Ancestors
Cost   
Install Length 1,274 feet  
Install Vertical 306 feet 
Final Season Standing  
Descendants
Notes 65 HP, 700 FPM.  

The lift line (2017)
The lift line (2017)

Staged lift components (2017)
Staged lift components (2017)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The base terminal (2018)
The base terminal (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The base terminal (2018)
The base terminal (2018)



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
From a small area to a mega resort
From a small area to a mega resort
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
A small community run ski area in Lebanon, NH
A small community run ski area in Lebanon, NH
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.