Snowdon Six Express
Killington
Vermont
Status Standing  
Type Chairlift - Sixpack - Detachable  
Brand Poma  
Install Season 2018-19  
New Install? New  
Ancestors
Cost $6,000,000  Vermont Act 250 Application
Install Length 4,428 feet  
Install Vertical 1,114 feet 
Final Season Standing  
Descendants
Notes Lift opened December 8, 2018. Bubble chairs. 700 HP, 1000 FPM  

Construction (September 2018)
Construction (September 2018)

Construction (September 2018)
Construction (September 2018)

The base terminal (December 2018)
The base terminal (December 2018)

The base terminal (December 2018)
The base terminal (December 2018)

The base terminal (December 2018)
The base terminal (December 2018)

The base terminal (December 2018)
The base terminal (December 2018)

A chair (December 2018)
A chair (December 2018)

The lift line (December 2018)
The lift line (December 2018)

The lift line (December 2018)
The lift line (December 2018)

The lift line (December 2018)
The lift line (December 2018)

The lift line (December 2018)
The lift line (December 2018)

The lift line (December 2018)
The lift line (December 2018)

The top terminal (December 2018)
The top terminal (December 2018)

The base terminal (December 2018)
The base terminal (December 2018)

The top terminal (December 2018)
The top terminal (December 2018)

The top terminal (December 2018)
The top terminal (December 2018)

The base terminal (December 2018)
The base terminal (December 2018)



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
The only high speed quad area in New England to close
The only high speed quad area in New England to close
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
Once one of the busiest areas in New England...now idle
Once one of the busiest areas in New England...now idle
A lost ski area with a gondola!
A lost ski area with a gondola!
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.