CT
|
MA
|
ME
|
NH
|
RI
|
VT
New England Ski Lift Database
Sunnyside Chair
Mad River Glen
Vermont
Status
Standing
Type
Chairlift - Double - Fixed
Brand
Mueller-Borvig-Doppelmayr-CTEC
Install Season
1961-62
New Install?
New
Ancestors
Cost
Install Length
4,300 feet
Install Vertical
1,405 feet
Final Season Standing
Descendants
Notes
Rebuilt with Doppelmayr base terminal for 1982-83. Towers and chairs replaced by Garaventa CTEC for 1998-99 season.
The Sunnyside Chair circa the 1960s
The Sunnyside Chair circa the 1960s
The bottom terminal (1971)
The Sunnyside Chair in 2005
The Sunnyside Chair in 2005
The Sunnyside Chair in 2005
The top of the Sunnyside Chair in 2006
The top of the Sunnyside Chair in 2006
The top of the Sunnyside Chair in 2006
The lift line (2014)
The Sunnyside Double (2014)
The bottom terminal (2014)
The bottom terminal (2014)
The lift line (2014)
The lift line (2014)
The lift line (2014)
The bottom terminal (2014)
The bottom terminal (2014)
The bottom terminal (2014)
The bottom terminal (2014)
Load More Photos
Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
A grand hotel in northern New Hampshire
A classic trail cut by the Civilian Conservation Corps
Before the resort, there was the Nose Dive
A lost ski area with a gondola!
A 5,000 acre resort with a tram and monorail? Almost.
CCC Trails
Cancelled Ski Areas
Expansions
Lifts
Management
Maps
News
Then and Now
Timelines
Topics
In The Press
Links
Site Map
What's New
Feedback
Copyright 2002-2019, All Rights Reserved.