Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
Sunnyside Chair
Mad River Glen
Vermont
Status
Standing
Type
Chairlift - Double - Fixed
Brand
Mueller-Borvig-Doppelmayr-CTEC
Install Season
1961-62
New Install?
New
Ancestors
Cost
Install Length
4,300 feet
Install Vertical
1,405 feet
Final Season Standing
Descendants
Notes
Rebuilt with Doppelmayr base terminal for 1982-83. Towers and chairs replaced by Garaventa CTEC for 1998-99 season.
The Sunnyside Chair circa the 1960s
The Sunnyside Chair circa the 1960s
The bottom terminal (1971)
The Sunnyside Chair in 2005
The Sunnyside Chair in 2005
The Sunnyside Chair in 2005
The top of the Sunnyside Chair in 2006
The top of the Sunnyside Chair in 2006
The top of the Sunnyside Chair in 2006
The Sunnyside Double (2014)
The bottom terminal (2014)
The bottom terminal (2014)
The bottom terminal (2014)
The bottom terminal (2014)
The bottom terminal (2014)
The bottom terminal (2014)
The bottom terminal (2014)
The bottom terminal (2014)
The lift line (2014)
The lift line (2014)
Load More Photos
Topics
Links
What's New
Feedback
Copyright 2002-2024, All Rights Reserved.