NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Snow Dance Double
Mount Snow
Vermont
Status Removed  
Type Chairlift - Double - Fixed  
Brand Carlevaro & Savio  
Install Season 1961-62  
New Install? New  
Ancestors
Cost   
Install Length 5,200 feet  
Install Vertical  
Final Season Standing 1995-96  
Descendants
Notes Likely removed after 1995-96 season.  

The Snow Dance Double (left) with the Standard Lift (right) circa the mid 1960s
The Snow Dance Double (left) with the Standard Lift (right) circa the mid 1960s

The Exhibition Lift (bottom) and Snow Dance Double (top) circa the 1960s
The Exhibition Lift (bottom) and Snow Dance Double (top) circa the 1960s



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.