NewEnglandSkiHistory.com SkiNewEngland.net
Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
Summit Double
Gunstock Mountain Resort
New Hampshire
Status Removed  
Type Chairlift - Double - Fixed  
Brand Mueller  
Install Season 1962-63  
New Install? New  
Ancestors
Cost   
Install Length 6,500 feet  
Install Vertical 1,400 feet 
Final Season Standing 1985-86  
Descendants
Notes  
Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
A lost ski area with a gondola!
A lost ski area with a gondola!
West Bowl at Jay Peak?
West Bowl at Jay Peak?
Topics       Links       What's New       Feedback
NewEnglandSkiHistory.com Copyright 2002-2023, All Rights Reserved. SkiNewEngland.net