Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
Want to advertise on NewEnglandSkiHistory.com?
New England Ski Lift Database
Rangeley Double
Saddleback Mountain Resort
Maine
Status
Removed
Type
Chairlift - Double - Fixed
Brand
Mueller-Doppelmayr-CTEC-Borvig
Install Season
1963-64
New Install?
New
Ancestors
Cost
Install Length
4,550 feet
Install Vertical
1,117 feet
Final Season Standing
2019-20
Descendants
Notes
Mueller double chairlift later retrofitted with Borvig chairs. Extended and rebuilt by Doppelmayr CTEC for 2004-05.
Load Previous 20 Photos
The top terminal (2017)
The top terminal (2017)
The top terminal (2017)
The base terminal (December 2017)
The lift line (December 2017)
The base terminal (background) (March 2018)
The lift line (background) (March 2018)
The base terminal (September 2018)
The base terminal (September 2018)
The base terminal (September 2018)
The lift line (September 2018)
The base terminal (July 2019)
The base terminal (July 2019)
The base terminal (July 2019)
The lift line (July 2019)
The lift line (July 2019)
The lift line (July 2019)
The top terminal (July 2019)
The top terminal (July 2019)
The top terminal (July 2019)
Load More Photos
Advertisement
Topics
Links
What's New
Feedback
Copyright 2002-2024, All Rights Reserved.