NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Southside Double
King Ridge
New Hampshire
Status Removed  
Type Chairlift - Double - Fixed  
Brand Hall  
Install Season 1967-68  
New Install? New  
Ancestors
Cost   
Install Length 2,631 feet  
Install Vertical 387 feet 
Final Season Standing  
Descendants
Notes  

The bottom of the former Southside Double (2014)
The bottom of the former Southside Double (2014)

The bottom of the former Southside Double (2014)
The bottom of the former Southside Double (2014)

The former Southside Double lift line (2014)
The former Southside Double lift line (2014)

The former Southside Double lift line (2014)
The former Southside Double lift line (2014)



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
A grand hotel in northern New Hampshire
A grand hotel in northern New Hampshire
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
A lost ski area with a gondola!
A lost ski area with a gondola!
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.