NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Heron Double
Tenney Mountain
New Hampshire
Status Removed  
Type Chairlift - Double - Fixed  
Brand Heron-Poma  
Install Season 1970-71  
New Install? New  
Ancestors
Cost   
Install Length 1,356 feet  
Install Vertical 260 feet 
Final Season Standing 1985-86  
Descendants
Notes  

The Heron Double circa the 1980s
The Heron Double circa the 1980s



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.