Double Runner East
Sugarloaf Mountain Resort Maine
|
Status |
Standing |
Type |
Chairlift - Double - Fixed |
Brand |
Borvig |
Install Season |
1974-75 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
3,080 feet |
Install Vertical |
617 feet |
Final Season Standing |
|
Descendants |
| Notes |
125 HP. |
|
|
 The Double Runner base terminal in 2008
 The Double Runner in 2008
 The Double Runner in 2008
 The Double Runner in 2008
 The Double Runner in 2008
 The Double Runner East top terminal in 2008
 The Double Runner East top terminal in 2008
 The Double Runner base terminal in 2008
 The Double Runner in 2011
 The Double Runner base terminal in 2011
 The Double Runner in 2011
 The Double Runner in 2011
 The Double Runner in 2011
 The Double Runner in 2011
 A Double Runner East sheave train in 2011
 A Double Runner East sheave train in 2011
 The Double Runner East top terminal in 2011
 The Double Runner East top terminal in 2011
 The bottom terminal (right) (2014)
 The lift line (left) (2014)
Load More Photos
|