Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
Want to advertise on NewEnglandSkiHistory.com?
New England Ski Lift Database
Summit Poma
Pico Mountain
Vermont
Status
Partially Standing
Type
Platter
Brand
Poma
Install Season
1978-79
New Install?
Ancestors
Cost
Install Length
2,329 feet
Install Vertical
Final Season Standing
1998-99
Descendants
Notes
Likely installed in 1978-79, possibly removed after 1998-99.
Remains of the Summit Poma in 2006
Remains of the Summit Poma in 2010
Remains of the Summit Poma in 2010
The top footings (2016)
The top footings (2016)
The base terminal (2017)
The base terminal (2017)
The base terminal (2017)
The base terminal (2017)
The base terminal (2017)
The base terminal (2017)
The lift line (2017)
The base terminal (2018)
Topics
Links
What's New
Feedback
Copyright 2002-2024, All Rights Reserved.