Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
Want to advertise on NewEnglandSkiHistory.com?
New England Ski Lift Database
North Peak Triple
Mount Sunapee Resort
New Hampshire
Status
Standing
Type
Chairlift - Triple - Fixed
Brand
Doppelmayr
Install Season
1987-88
New Install?
New
Ancestors
Cost
$709,121 State of New Hampshire
Install Length
3,300 feet
Install Vertical
970 feet
Final Season Standing
Descendants
Notes
The North Peak Triple in 2002
The North Peak Triple in 2003
The North Peak Triple in 2004
The North Peak Triple in 2006
The North Peak Triple in 2006
The North Peak Triple in 2006
The North Peak Triple in 2006
The North Peak Triple in 2006
The North Peak Triple in 2013
The North Peak Triple in 2013
The North Peak Triple in 2013
The bottom terminal (2015)
The base terminal (2018)
The lift line (2018)
The top terminal (2018)
The base terminal (2018)
The base terminal (2018)
The base terminal (2018)
The base terminal (2018)
Topics
Links
What's New
Feedback
Copyright 2002-2024, All Rights Reserved.