NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Q1 Quad
Jiminy Peak Mountain Resort
Massachusetts
Status Standing  
Type Chairlift - Quad - Fixed  
Brand CTEC  
Install Season 1992-93  
New Install?  
Ancestors Summit Quad, Crotched, NH
Cost $650,000  Berkshire Eagle
Install Length 2,855 feet  
Install Vertical  
Final Season Standing  
Descendants
Notes  

The Q1 Quad in 2002
The Q1 Quad in 2002

The Q1 Quad in 2002
The Q1 Quad in 2002

The Q1 Quad in 2005
The Q1 Quad in 2005

The Q1 Quad in 2005
The Q1 Quad in 2005

The Q1 Quad in 2016
The Q1 Quad in 2016

The base terminal (January 2019)
The base terminal (January 2019)

The base terminal (January 2019)
The base terminal (January 2019)

The base terminal (January 2019)
The base terminal (January 2019)

The base terminal (January 2019)
The base terminal (January 2019)

The lift line (January 2019)
The lift line (January 2019)

The lift line (January 2019)
The lift line (January 2019)

The top terminal (January 2019)
The top terminal (January 2019)

The top terminal (January 2019)
The top terminal (January 2019)



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.