NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Top Flight Quad
Ski Butternut
Massachusetts
Status Standing  
Type Chairlift - Quad - Fixed  
Brand CTEC-Carlevaro & Savio  
Install Season 1993-94  
New Install? New  
Ancestors Sheave Train, Butternut, MA
Cost $750,000  Butternut
Install Length 4,025 feet  
Install Vertical 940 feet 
Final Season Standing  
Descendants
Notes Towers reused from Sheave Train double.  

The Top Flight Quad wreckage after the May 1995 tornado
The Top Flight Quad wreckage after the May 1995 tornado

The Top Flight Quad in 2002
The Top Flight Quad in 2002

The Top Flight Quad in 2003
The Top Flight Quad in 2003

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The top terminal (2015)
The top terminal (2015)

The bottom terminal (2016)
The bottom terminal (2016)

A grip (2016)
A grip (2016)

A cross arm (2016)
A cross arm (2016)

The lift line (2016)
The lift line (2016)

The top terminal (2016)
The top terminal (2016)

The top terminal (2016)
The top terminal (2016)



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
Once a large ski area, now defunct
Once a large ski area, now defunct
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Will Tenney's lifts spin again?
Will Tenney's lifts spin again?
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.