Jordan Mountain Double
Sunday River Maine
|
Status |
Standing |
Type |
Chairlift - Double - Fixed |
Brand |
Garaventa CTEC-Hall |
Install Season |
1994-95 |
New Install? |
|
Ancestors |
|
Cost |
|
Install Length |
1,735 feet |
Install Vertical |
342 feet |
Final Season Standing |
|
Descendants |
| Notes |
|
|
|
 The Jordan Mountain Double east terminal in 2007
 The Jordan Mountain Double west terminal in 2007
 The Jordan Mountain Double in 2007
 The Jordan Mountain Double in 2007
 The east terminal (2016)
 The east terminal (2016)
 The east terminal (2016)
 The west terminal (2016)
 The east terminal (March 2018)
 A grip (March 2018)
 The lift line (March 2018)
 The lift line (March 2018)
 The lift line (March 2018)
 The west terminal (March 2018)
 The east terminal (November 2018)
|