NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Cricket Triple
Jiminy Peak Mountain Resort
Massachusetts
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Partek  
Install Season 1996-97  
New Install? New  
Ancestors
Cost   
Install Length 650 feet  
Install Vertical 56 feet 
Final Season Standing  
Descendants
Notes  

The Cricket Triple in 2002
The Cricket Triple in 2002

The base terminal (January 2019)
The base terminal (January 2019)

The base terminal (January 2019)
The base terminal (January 2019)

A grip (January 2019)
A grip (January 2019)

The lift line (January 2019)
The lift line (January 2019)

The lift line (January 2019)
The lift line (January 2019)

The lift line (January 2019)
The lift line (January 2019)

The lift line (January 2019)
The lift line (January 2019)

The top terminal (January 2019)
The top terminal (January 2019)

The top terminal (January 2019)
The top terminal (January 2019)



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
The only Skimobile in New England history
The only Skimobile in New England history
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Will Tenney's lifts spin again?
Will Tenney's lifts spin again?
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.