NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Berkshire Express
Jiminy Peak Mountain Resort
Massachusetts
Status Standing  
Type Chairlift - Sixpack - Detachable  
Brand Garaventa CTEC  
Install Season 2000-01  
New Install? New  
Ancestors
Cost $2,200,000  Courier Post
Install Length 3,922 feet  
Install Vertical 1,113 feet 
Final Season Standing  
Descendants
Notes  
Load Previous 20 Photos

The top terminal (January 2019)
The top terminal (January 2019)

The top terminal (January 2019)
The top terminal (January 2019)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
From a small area to a mega resort
From a small area to a mega resort
A lost ski area with a gondola!
A lost ski area with a gondola!
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.