NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
South Branch Quad
Saddleback Mountain Resort
Maine
Status Standing  
Type Chairlift - Quad - Fixed  
Brand Doppelmayr-CTEC  
Install Season 2004-05  
New Install? New  
Ancestors
Cost   
Install Length 2,760 feet  
Install Vertical 346 feet 
Final Season Standing  
Descendants
Notes  
Load Previous 20 Photos

The top terminal (December 2017)
The top terminal (December 2017)

The base terminal (July 2019)
The base terminal (July 2019)

The base terminal (July 2019)
The base terminal (July 2019)

The base terminal (July 2019)
The base terminal (July 2019)

The base terminal (July 2019)
The base terminal (July 2019)

The base terminal (July 2019)
The base terminal (July 2019)

The base terminal (July 2019)
The base terminal (July 2019)

The base terminal (July 2019)
The base terminal (July 2019)

The base terminal (July 2019)
The base terminal (July 2019)

Chairs (July 2019)
Chairs (July 2019)

Chairs (July 2019)
Chairs (July 2019)

The lift line (July 2019)
The lift line (July 2019)

The lift line (July 2019)
The lift line (July 2019)

The top terminal (July 2019)
The top terminal (July 2019)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
West Bowl at Jay Peak?
West Bowl at Jay Peak?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.