Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
Lincoln Express
Loon Mountain Resort
New Hampshire
Status
Standing
Type
Chairlift - Quad - Detachable
Brand
Doppelmayr-CTEC
Install Season
2007-08
New Install?
New
Ancestors
Cost
Install Length
5,160 feet
Install Vertical
1,475 feet
Final Season Standing
Descendants
Notes
Construction of the Lincoln Express in 2007
Construction of the Lincoln Express in 2007
The Lincoln Express Quad in 2008
The Lincoln Express Quad in 2008
The Lincoln Express Quad in 2008
The Lincoln Express Quad in 2008
The Lincoln Express Quad in 2013
The Lincoln Express Quad in 2013
The Lincoln Express Quad in 2013
The Lincoln Express Quad in 2013
The Lincoln Express Quad in 2013
The Lincoln Express Quad in 2013
The Lincoln Express Quad in 2013
The base terminal (January 2018)
The base terminal (January 2018)
The lift line (January 2018)
The lift line (January 2018)
Topics
Links
What's New
Feedback
Copyright 2002-2024, All Rights Reserved.