T-Bar
Ascutney Mountain
Vermont
Status Construction  
Type T-Bar  
Brand Doppelmayr  
Install Season 2019-20  
New Install?  
Ancestors Centre de ski Le Relais, QC
Cost   
Install Length 1,761 feet  
Install Vertical 435 feet 
Final Season Standing  
Descendants
Notes Construction started in fall 2018.  

The lift in storage (December 2017)
The lift in storage (December 2017)

The lift in storage (December 2017)
The lift in storage (December 2017)

The base terminal footing (October 2018)
The base terminal footing (October 2018)

Towers (October 2018)
Towers (October 2018)

The base terminal (June 2019)
The base terminal (June 2019)

The base terminal (June 2019)
The base terminal (June 2019)

The future top unload (June 2019)
The future top unload (June 2019)



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
A lost ski area with a gondola!
A lost ski area with a gondola!
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.