Glades Triple
Catamount Massachusetts
|
Status |
Construction |
Type |
Chairlift - Triple - Fixed |
Brand |
Poma |
Install Season |
2022-23 |
New Install? |
|
Ancestors |
|
Cost |
|
Install Length |
|
Install Vertical |
|
Final Season Standing |
|
Descendants |
| Notes |
Construction started in 2021. |
|
|
 Footings (May 2021)
 The lift line (July 2021)
 The base terminal (July 2021)
 The lift line (July 2021)
 Tower installation (August 2021)
 The lift line (August 2021)
 The top terminal (August 2021)
 The top terminal (October 2021)
 The top terminal (January 2022)
 The base terminal (January 2022)
 The top terminal (January 2022)
 The lift line (January 2022)
 The lift line (January 2022)
 The lift line (January 2022)
 The base terminal (January 2022)
 The base terminal (January 2022)
 The base terminal (January 2022)
|