Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
Summit Double
Mt. Tom Ski Area
Massachusetts
Status
Removed
Type
Chairlift - Double - Fixed
Brand
Roebling
Install Season
1961-62
New Install?
Ancestors
Cost
Install Length
3,450 feet
Install Vertical
Final Season Standing
1998-99
Descendants
Ski area in Pennsylvania
Notes
The Summit Double circa the mid 1960s
Construction of the lift (fall 1961)
The base terminal (December 1961)
The lift line (March 1962)
Summit Double circa the 1970s
Summit Double remains in 2006
The lift line (February 2024)
The top terminal (February 2024)
The top terminal (February 2024)
Topics
Links
What's New
Feedback
Copyright 2002-2024, All Rights Reserved.