NewEnglandSkiHistory.com SkiNewEngland.net
Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
Double Chair
Moose Mountain
New Hampshire
Status Partially Standing  
Type Chairlift - Double - Fixed  
Brand Mueller  
Install Season 1961-62  
New Install? New  
Ancestors
Cost   
Install Length 2,400 feet  
Install Vertical  
Final Season Standing  
Descendants
Notes Towers and top terminal still standing as of 2014. Cable down. Drive removed.  
Load Previous 20 Photos

Load More Photos
Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
The only high speed quad area in New England to close
The only high speed quad area in New England to close
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
From a small area to a mega resort
From a small area to a mega resort
A lost ski area with a gondola!
A lost ski area with a gondola!
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
Topics       Links       What's New       Feedback
NewEnglandSkiHistory.com Copyright 2002-2023, All Rights Reserved. SkiNewEngland.net