|
Madonna I Lift
Smugglers Notch Vermont
|
Status |
Standing |
Type |
Chairlift - Double - Fixed |
Brand |
Hall |
Install Season |
1963-64 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
6,719 feet |
Install Vertical |
2,150 feet |
Final Season Standing |
|
Descendants |
| Notes |
Rebuilt by CTEC for 2002-03 |
|
|
 The upper lift line circa the 1970s
 The Madonna Double in 2004
 The Madonna Double in 2004
 The Madonna Double in 2004
 The Madonna Double in 2004
 The Madonna Double in 2004
 The Madonna Double in 2004
 The Madonna Double in 2004
 The Madonna Double in 2004
 The Madonna Double in 2004
 The Madonna Double in 2004
 The Madonna Double in 2004
 The Madonna Double bottom terminal (2014)
 The Madonna Double bottom terminal (2014)
 The Madonna Double bottom terminal (2014)
 The Madonna Double bottom terminal (2014)
 The Madonna Double bottom terminal (2014)
 A Madonna Double sheave train (2014)
 Test chairs (2014)
 The portal tower (2014)
Load More Photos
|
|
|
CCC Trails
Cancelled Ski Areas
Expansions
Lifts
Management
Maps
News
Then and Now
Timelines
Topics
In The Press
Links
Site Map
What's New
Feedback
Copyright 2002-2019, All Rights Reserved.
|