NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Sterling Lift
Smugglers Notch
Vermont
Status Standing  
Type Chairlift - Double - Fixed  
Brand Hall  
Install Season 1964-65  
New Install? New  
Ancestors
Cost   
Install Length 5,700 feet  
Install Vertical 1,500 feet 
Final Season Standing  
Descendants
Notes  
Load Previous 20 Photos

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)

The bottom terminal (2015)
The bottom terminal (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The top terminal (2015)
The top terminal (2015)

The top terminal (2015)
The top terminal (2015)

The top terminal (2015)
The top terminal (2015)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
From a small area to a mega resort
From a small area to a mega resort
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.