NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
T-Bar
Indianhead
Massachusetts
Status  
Type T-Bar  
Brand Sneller  
Install Season 1965-66  
New Install? New  
Ancestors
Cost   
Install Length 1,219 feet  
Install Vertical 205 feet 
Final Season Standing  
Descendants
Notes Double T-Bar installed for 1965-66 season  



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
Once a large ski area, now defunct
Once a large ski area, now defunct
From a small area to a mega resort
From a small area to a mega resort
A lost ski area with a gondola!
A lost ski area with a gondola!
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.