NewEnglandSkiHistory.com SkiNewEngland.net
Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
High Country Double
Waterville Valley Resort
New Hampshire
Status Removed  
Type Chairlift - Double - Fixed  
Brand Stadeli  
Install Season 1966-67  
New Install? New  
Ancestors
Cost   
Install Length 1,550 feet  
Install Vertical 400 feet 
Final Season Standing 2017-18  
Descendants
Notes Electric drive installed for 2011-12 season, increasing lift speed.  
Load Previous 20 Photos

Load More Photos
Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
A small community run ski area in Lebanon, NH
A small community run ski area in Lebanon, NH
Topics       Links       What's New       Feedback
NewEnglandSkiHistory.com Copyright 2002-2023, All Rights Reserved. SkiNewEngland.net