NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Aerial Tram
Jay Peak Resort
Vermont
Status Standing  
Type Aerial Tramway  
Brand Von Roll  
Install Season 1966-67  
New Install? New  
Ancestors
Cost $2,000,000  Granby Leader-Mail
Install Length 7,776 feet  
Install Vertical 1,953 feet 
Final Season Standing  
Descendants
Notes Hangers and cabins replaced for 2000-01 season. New control installed for 2005-06 season.  
Load Previous 20 Photos

The lift line (2017)
The lift line (2017)

The top terminal (2017)
The top terminal (2017)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
From a small area to a mega resort
From a small area to a mega resort
Will Tenney's lifts spin again?
Will Tenney's lifts spin again?
A small community run ski area in Lebanon, NH
A small community run ski area in Lebanon, NH
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.