NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Top Notch Double
Attitash Mountain Resort
New Hampshire
Status Partially Standing  
Type Chairlift - Double - Fixed  
Brand Hall  
Install Season 1968-69  
New Install? New  
Ancestors
Cost   
Install Length 4,961 feet  
Install Vertical 1,525 feet 
Final Season Standing 2017-18  
Descendants Smuggers Notch, VT
Notes Most components sold to Smugglers Notch, VT. Motor repurposed at Attitash.  
Load Previous 20 Photos

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The lift line (2018)
The lift line (2018)

The lift line (March 2018)
The lift line (March 2018)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
Once one of the busiest areas in New England...now idle
Once one of the busiest areas in New England...now idle
A lost ski area with a gondola!
A lost ski area with a gondola!
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.