East Basin Double
Loon Mountain Resort New Hampshire
|
Status |
Standing |
Type |
Chairlift - Double - Fixed |
Brand |
Hall-Doppelmayr-CTEC |
Install Season |
1968-69 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
3,690 feet |
Install Vertical |
1,230 feet |
Final Season Standing |
|
Descendants |
| Notes |
Drive replaced with Doppelmayr in 1982. |
|
|
 Installation of the East Basin Double in 1968
 The East Basin Double in 2007
 The East Basin Double in 2007
 The East Basin Double in 2007
 The East Basin Double in 2007
 The East Basin Double in 2012
 The East Basin Double in 2013
 The East Basin Double in 2013
 The East Basin Double in 2013
 The East Basin Double in 2013
 The lift line (April 2016)
 The lift line (April 2016)
 The lift line (April 2016)
 The lift line (April 2016)
 The top terminal (April 2016)
 The top terminal (2018)
|