NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Poma
Burke Mountain Resort
Vermont
Status Removed  
Type Platter  
Brand Poma  
Install Season 1955-56  
New Install?  
Ancestors
Cost $43,512  Caledonian Record
Install Length 5,196 feet  
Install Vertical 1,483 feet 
Final Season Standing 2016-17  
Descendants
Notes Model T100, 120HP. Likely truncated after 1965-66 season. Likely extended for 1982-83 season.  
Load Previous 20 Photos

The lift line (2017)
The lift line (2017)

The lift line (2017)
The lift line (2017)

The lift line (2017)
The lift line (2017)

The lift line (2017)
The lift line (2017)

The top terminal (2017)
The top terminal (2017)

The top terminal (2017)
The top terminal (2017)

The top terminal (2017)
The top terminal (2017)

The top terminal (2017)
The top terminal (2017)

Removal of the Poma (2017)
Removal of the Poma (2017)

Removal of the Poma (2017)
Removal of the Poma (2017)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
The only Skimobile in New England history
The only Skimobile in New England history
Regaining its Magic
Regaining its Magic
A lost ski area with a gondola!
A lost ski area with a gondola!
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.