Sunrise Double
Ascutney Mountain Vermont
|
Status |
Removed |
Type |
Chairlift - Double - Fixed |
Brand |
Hall |
Install Season |
1970-71 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
1,947 feet |
Install Vertical |
434 feet |
Final Season Standing |
2017-18 |
Descendants |
| Notes |
Partially removed in 2018. Towers and upper terminal removed in 2019. |
|
|
 The bottom terminal (2004)
 Sunrise Double in 2013
 Sunrise Double in 2013
 The portal tower (2014)
 The lift line (2014)
 The portal tower (2014)
 The bottom terminal (2014)
 A chair (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The base terminal (December 2017)
 The base terminal (October 2018)
 Dropping the haul rope to remove a tower (October 2018)
 The base terminal (June 2019)
Load More Photos
|