Practice Slope Chair
Mad River Glen Vermont
|
Status |
Standing |
Type |
Chairlift - Double - Fixed |
Brand |
Mueller |
Install Season |
1972-73 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
1,319 feet |
Install Vertical |
288 feet |
Final Season Standing |
|
Descendants |
| Notes |
|
|
|
 The Practice Double in 2002
 The Practice Double in 2005
 The Practice Double in 2006
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 The bottom terminal (2014)
 A grip (2014)
 Looking up the lift line (2014)
 Looking up the lift line (2014)
 The bottom terminal (2015)
 The lift line (2015)
 The lift line (2015)
 The lift line (2015)
 The top terminal (2015)
|