NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Seasons Double
Mount Snow
Vermont
Status Standing  
Type Chairlift - Double - Fixed  
Brand Hall  
Install Season 1972-73  
New Install? New  
Ancestors
Cost   
Install Length 1,070 feet  
Install Vertical 155 feet 
Final Season Standing  
Descendants
Notes  

Seasons Double (left) in 2002
Seasons Double (left) in 2002

The top terminal (2016)
The top terminal (2016)

The top terminal (2016)
The top terminal (2016)

The top terminal (2016)
The top terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

The base terminal (December 2018)
The base terminal (December 2018)

The base terminal (December 2018)
The base terminal (December 2018)

The lift line (December 2018)
The lift line (December 2018)

The lift line (December 2018)
The lift line (December 2018)

The lift line (December 2018)
The lift line (December 2018)

The top terminal (December 2018)
The top terminal (December 2018)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.