NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Snowdon Triple
Killington
Vermont
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Heron-Poma  
Install Season 1973-74  
New Install? New  
Ancestors
Cost   
Install Length 4,435 feet  
Install Vertical 1,070 feet 
Final Season Standing  
Descendants
Notes  
Load Previous 20 Photos

The top terminal (2016)
The top terminal (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)

A grip (2016)
A grip (2016)

The base terminal (2016)
The base terminal (2016)

The base terminal (2018)
The base terminal (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The mid station (2018)
The mid station (2018)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
From a small area to a mega resort
From a small area to a mega resort
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2023, All Rights Reserved.