NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Madonna II Lift
Smugglers Notch
Vermont
Status Standing  
Type Chairlift - Double - Fixed  
Brand Hall  
Install Season 1979-80  
New Install? New  
Ancestors
Cost   
Install Length 4,567 feet  
Install Vertical 1,159 feet 
Final Season Standing  
Descendants
Notes  

The Madonna II Double in 2004
The Madonna II Double in 2004

The Madonna II Double in 2004
The Madonna II Double in 2004

The Madonna II Double in 2004
The Madonna II Double in 2004

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The lift line (2014)
The lift line (2014)

A grip (2014)
A grip (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2015)
The bottom terminal (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The top terminal (2015)
The top terminal (2015)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
Once a large ski area, now defunct
Once a large ski area, now defunct
Regaining its Magic
Regaining its Magic
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.