NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Witches Triple
Haystack Mountain
Vermont
Status Standing  
Type Chairlift - Triple - Fixed  
Brand CTEC  
Install Season 1987-88  
New Install? New  
Ancestors
Cost   
Install Length 2,350 feet  
Install Vertical 685 feet 
Final Season Standing  
Descendants
Notes 200 HP motor rebuilt in 2012. APU is John Deere Diesel.  

Witches Triple bottom terminal in 2006
Witches Triple bottom terminal in 2006

Witches Triple bottom terminal in 2006
Witches Triple bottom terminal in 2006

Witches Triple bottom terminal in 2006
Witches Triple bottom terminal in 2006

Witches Triple in 2006
Witches Triple in 2006

Witches Triple in 2006
Witches Triple in 2006

Witches Triple in 2006
Witches Triple in 2006

The Witches Triple in 2013
The Witches Triple in 2013



Also on NewEnglandSkiHistory.com...
The largest ski resort in New England.  Almost.
The largest ski resort in New England. Almost.
Killington and Pico almost connected
Killington and Pico almost connected
Once a large ski area, now defunct
Once a large ski area, now defunct
From a small area to a mega resort
From a small area to a mega resort
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.