NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Heavy Metal
Mount Snow
Vermont
Status Standing  
Type Chairlift - Double - Fixed  
Brand Yan  
Install Season 1987-88  
New Install? New  
Ancestors
Cost   
Install Length 3,239 feet  
Install Vertical 574 feet 
Final Season Standing  
Descendants
Notes  

Heavy Metal Double in 2002
Heavy Metal Double in 2002

Heavy Metal Double in 2006
Heavy Metal Double in 2006

Heavy Metal Double in 2006
Heavy Metal Double in 2006

Heavy Metal Double in 2006
Heavy Metal Double in 2006

Heavy Metal Double in 2006
Heavy Metal Double in 2006

Heavy Metal Double in 2006
Heavy Metal Double in 2006

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

The lift line (2016)
The lift line (2016)

The top terminal (2016)
The top terminal (2016)

The top terminal (2016)
The top terminal (2016)

The top terminal (2016)
The top terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
The only Skimobile in New England history
The only Skimobile in New England history
Regaining its Magic
Regaining its Magic
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.