Blue Ribbon Quad
Bromley Mountain Resort Vermont
|
Status |
Standing |
Type |
Chairlift - Quad - Fixed |
Brand |
Poma |
Install Season |
1988-89 |
New Install? |
New |
Ancestors |
|
Cost |
$700,000 Rutland Herald |
Install Length |
3,200 feet |
Install Vertical |
926 feet |
Final Season Standing |
|
Descendants |
| Notes |
|
|
|
 The Blue Ribbon Quad bottom terminal in 2003
 The Blue Ribbon Quad top terminal in 2006
 The Blue Ribbon Quad bottom terminal in 2014
 The Blue Ribbon Quad bottom terminal in 2014
 The Blue Ribbon Quad bottom terminal in 2014
 The Blue Ribbon Quad in 2014
 The Blue Ribbon Quad in 2014
 The Blue Ribbon Quad in 2014
 The Blue Ribbon Quad top terminal in 2014
 The Blue Ribbon Quad top terminal in 2014
 The top terminal (2018)
 The top terminal (2018)
 The lift line (2018)
 The lift line (2018)
 The lift line (2018)
 The lift line (2018)
 A grip (2018)
 The base terminal (2018)
 The base terminal (2018)
 The base terminal (2018)
Load More Photos
|