NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
South Ridge Express
Sunday River
Maine
Status Standing  
Type Chairlift - Quad - Detachable  
Brand Poma  
Install Season 1992-93  
New Install? New  
Ancestors
Cost   
Install Length 3,074 feet  
Install Vertical 505 feet 
Final Season Standing  
Descendants
Notes  

The South Ridge Express bottom terminal in 2004
The South Ridge Express bottom terminal in 2004

The South Ridge Express bottom terminal in 2007
The South Ridge Express bottom terminal in 2007

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

A grip (2016)
A grip (2016)

The lift line (2016)
The lift line (2016)

The top terminal (2016)
The top terminal (2016)

The top terminal (2016)
The top terminal (2016)

The top terminal (November 2018)
The top terminal (November 2018)



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
West Bowl at Jay Peak?
West Bowl at Jay Peak?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.