NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Pinnacle Double
Granite Gorge
New Hampshire
Status Standing  
Type Chairlift - Double - Fixed  
Brand Borvig  
Install Season 2005-06  
New Install?  
Ancestors Devil's Elbow, ON
Cost   
Install Length 1,500 feet  
Install Vertical  
Final Season Standing  
Descendants
Notes Installed by helicopter in October 2005.  
Load Previous 20 Photos

The lift line (2018)
The lift line (2018)

A grip (2018)
A grip (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (November 2019)
The base terminal (November 2019)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
The largest ski resort in New England.  Almost.
The largest ski resort in New England. Almost.
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
West Bowl at Jay Peak?
West Bowl at Jay Peak?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.