Skye Peak Express Quad
Killington Vermont
|
Status |
Standing |
Type |
Chairlift - Quad - Detachable |
Brand |
Leitner-Poma |
Install Season |
2008-09 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
4,926 feet |
Install Vertical |
1,525 feet |
Final Season Standing |
|
Descendants |
| Notes |
|
|
|
Load Previous 20 Photos
 A grip (2016)
 The lift line (2016)
 The lift line (2016)
 The lift line (2016)
 The lift line (2016)
 The lift line (2016)
 The top terminal (2016)
 The top terminal (2016)
 The lift line (2018)
 The lift line (2018)
 The lift line (2018)
 The lift line (2018)
 The base terminal (2018)
 Tunnel construction (September 2018)
 The top terminal (2018)
 The top terminal (2018)
Load Previous 20 Photos
|